
PLAN JOURNEY ON ORANGE LINE
Metro Timings: 06:45 AM / 10:45 PM
Kolkata Metro Network CorridorLine 6Partial service
Kolkata Metro Network Orange Line (Line 6) — Route, Timings, Stations & Schedule
Terminal Route: Kavi Subhash (New Garia) ↔ Hemanta Mukherjee. Complete station sequence, first & last train timings, peak frequency, and interchanges across 5.4 km track.
Orange Line
First Train
09:00 AM
Last Train
16:40 PM
Train Frequency
Every 20 – 30 min
Corridor Span
5 Stops (5.4 km)
Corridor Information & Overview
The Orange Line (Line 6) is a major rapid transit corridor in Kolkata Metro Network, extending over 5.4 km and connecting 5 active stations from Kavi Subhash (New Garia) to Hemanta Mukherjee.
Operating as an elevated transit network, the corridor facilitates daily travel across dense commercial hubs, residential districts, and major educational and transit interchange junctions.
Operational: Kavi Subhash – Hemanta Mukherjee only.
Track Length
5.4 km
Total Stations
5 Stops
Corridor Type
Elevated
Terminal A
Kavi Subhash (New Garia)
Terminal B
Hemanta Mukherjee
Ticketing
Smart Card & QR
Operating Schedule & Timetable
Monday to Saturday ScheduleFull Operations
First Train
09:00 AM
Last Train
16:40 PM
Peak Frequency
Every 20 – 30 min
Sunday & Holiday ServiceSpecial Timetable
Sunday First
No Sunday service
Sunday Last
—
Sunday Headway
—
Verified with Metro Railway, Kolkata (Ministry of Railways)View Full Network Map →
Station Sequence (5 Stops)
Click any station for platform info and street exitsAll Kolkata Stations Directory →
Major Interchange Junctions
Kavi Subhash (New Garia) (কবি সুভাষ)Transfer Hub
Blue LineIndian Railways Link
Step-free concourse accessStation Guide
Interchange tokens remain valid across transfersView Fare Chart & Rules →
Frequently Asked Questions (Orange Line)
Essential commuter information regarding Kolkata Metro Network Orange Line timetables, station transfers, and ticketing.
What are the first and last train timings on Kolkata Metro Network Orange Line?
On weekdays (Monday to Saturday), first trains on the Orange Line depart at 09:00 AM and the last commercial service runs at 16:40 PM with peak headway of Every 20 – 30 min. Sunday services run on customized schedules.
How many stations are there on the Orange Line and what is the corridor length?
The Orange Line (Line 6) covers a total distance of 5.4 km with 5 operational stations, running between Kavi Subhash (New Garia) and Hemanta Mukherjee.
Which stations on the Orange Line offer interchange to other metro corridors?
Passengers can transfer to other metro corridors and mainline railways at: Kavi Subhash (New Garia). Concourse walkways allow step-free transfers.
Does the Orange Line operate on Sundays?
Sunday operations on this corridor are limited or start later in the day. Passengers are advised to verify real-time station advisories before weekend travel.
What is the fare structure and ticketing system for Orange Line?
Fares on the Orange Line follow official distance-based slabs starting at ₹5 up to ₹25. Commuters can pay using contactless Smart Cards, Single Journey QR tokens, and official mobile ticketing apps.