From Dakshineswar Station to Kavi Subhash (New Garia) Station Route

Travel Time
~50 min
Platform to platform
Token Fare
₹25
Smart Card: ₹25
Total Stops
25
Approx 31.3 km
Interchange
Direct
No train change

Step-by-Step Station Timeline

25 stations
Blue LineLine 1
TowardsKavi Subhash (New Garia)·25 stops
Board Train· Origin
Dakshineswar(দক্ষিণেশ্বর)
Baranagar
Stop 1
NoaparaInterchange
Stop 2
Dum Dum
Stop 3
Belgachia
Stop 4
Shyambazar
Stop 5
Shobhabazar Sutanuti
Stop 6
Girish Park
Stop 7
Mahatma Gandhi Road
Stop 8
Central
Stop 9
Chandni Chowk
Stop 10
EsplanadeInterchange
Stop 11
Park Street
Stop 12
Maidan
Stop 13
Rabindra Sadan
Stop 14
Netaji Bhavan
Stop 15
Jatin Das Park
Stop 16
Kalighat
Stop 17
Rabindra Sarobar
Stop 18
Mahanayak Uttam Kumar
Stop 19
Netaji
Stop 20
Masterda Surya Sen
Stop 21
Gitanjali
Stop 22
Kavi Nazrul
Stop 23
Shahid Khudiram
Stop 24
Destination
Kavi Subhash (New Garia)(কবি সুভাষ)
Arrived at destination
Fare Slab Disclaimer: Approximate fare based on verified Kolkata Metro Network fare slabs. Exact fare depends on distance slab.

Route Summary & Travel Overview

To reach Kavi Subhash (New Garia) from Dakshineswar, board the train at Dakshineswar station heading towards Kavi Subhash (New Garia) on the Blue Line. The track covers approximately 31.3 km spanning 25 station stops (including 24 intermediate stops).

This journey is a direct corridor transit on the same train line requiring no transfers. The train travels seamlessly to your destination in approximately 50 minutes.

A single journey token costs ₹25, while commuters using a Kolkata Metro Smart Card pay a discounted fare of ₹25 with bonus digital recharge credits. You can also generate instant paperless QR tickets through the official Aamar Kolkata Metro app with zero extra convenience charges (plus an exclusive 5% discount on all Blue Line journeys).

Trains run at high frequency every 5 to 10 minutes during peak commute hours. Dedicated female coach reservations are situated at the front of each train, and accessible boarding ramps assist senior citizens and Divyangjan passengers throughout the journey.

First & Last Train Timings (Dakshineswar)
Timetable
First Train06:50
Last Train21:40

Travel Cost & Road Mode Comparison

Rapid metro rail vs roadway alternatives for approx 31.3 km.

Metro Rail
₹25
~50 mins
AC · 0 Traffic
Two Wheeler
~₹376
~63 mins
Fuel + Parking
Auto Rickshaw
~₹563
~70 mins
Meter / Shared
Taxi / Cab
~₹876
~75 mins
Subject to surge
Commuter Savings & Transit Advantage
Best Value
Cost Savings
Save ~₹851
Vs city taxi / cab
Time Conserved
~20 mins faster
Zero traffic delays

Pre-Calculated Commuter Fare Table (Dakshineswar to Kavi Subhash (New Garia))

Compare physical counter token costs with Smart Card & Aamar Kolkata Metro App digital fares.

5% Off on Blue Line (Aamar App)Zero App Charges (₹0 Fee)10% Recharge Profit
Swipe table horizontally to compare Smart Card & App fares
Commute DurationTripsCounter TokenSmart CardAamar Kolkata Metro App (QR)Commuter Profit / Savings
Single Journey1 trip₹25₹25
₹23.755% OFF
Charges: ₹0 Fee · 5% Blue Line Discount
+₹0 Profit
Daily (Round-trip)2 trips₹50₹50
₹47.505% OFF
Charges: ₹0 Fee · 5% Blue Line Discount
+₹0 Profit
Weekly (5 Days)10 trips₹250₹250
₹237.505% OFF
Charges: ₹0 Fee · 5% Blue Line Discount
+₹0 Profit
Monthly (24 Days)48 trips₹1200₹1200
₹11405% OFF
Charges: ₹0 Fee · 5% Blue Line Discount
Save ₹0/mo
Zero Convenience Charges: Booking mobile QR tickets or recharging smart cards on the official Aamar Kolkata Metro app incurs ₹0 payment gateway fee.
5% Off on Blue Line: Commuters booking Blue Line (Line 1) QR tickets on the official Aamar Kolkata Metro app get an instant 5% ticket discount.
10% User Profit Bonus: A 10% bonus credit is added automatically on ₹100+ digital smart card recharges.

Dakshineswar (দক্ষিণেশ্বর) Metro Station Info

Boarding Station
Blue LineTerminal Station
Available Facilities: Elevator · Escalator · Parking · Railway link · Accessibility ramp · Tactile path
Nearby Landmarks: Dakshineswar Kali Temple, Belur Math
Full Station ProfileStation gates & map

Kavi Subhash (New Garia) (কবি সুভাষ) Metro Station Info

Destination Station
Blue LineOrange LineInterchange StationTerminal Station
Available Facilities: Elevator · Escalator · Parking · Railway link · Wifi · Atm · Accessibility ramp · Tactile path
Nearby Landmarks: Commercial and residential hub around Kavi Subhash (New Garia).
Full Station ProfileStation gates & map

Green Commute & Environmental Benefits

By choosing the metro electric rail system instead of fossil fuel road transport:

CO₂ Emissions Cut
4.38 kg
Electric rail
Fuel Conserved
1.88 L
Petrol saved
Time Saved
~20 min
Vs road traffic
Steps Energy
~145 kcal
Active walk

Commuter Travel Rules & Safety Guidelines

Key guidelines to follow when boarding and commuting on the metro network:

Platform Safety: Always stand behind the yellow tactile safety line on platforms while waiting for arriving trains.
Ticket Validity: Single-journey tokens are valid exclusively on the date and station of purchase.
Women Reservation: The first coach in the train's moving direction is reserved exclusively for female passengers.
Helpline & Assistance: In case of luggage loss or emergency, contact station staff or dial Metro Helpline 139.

Frequently Asked Questions (Dakshineswar to Kavi Subhash (New Garia))

How much is the metro fare from Dakshineswar to Kavi Subhash (New Garia)?
The standard single-journey token fare is ₹25. Commuters using a Kolkata Metro Smart Card pay a discounted fare of approximately ₹25. Booking via the official Aamar Kolkata Metro app offers an additional 5% discount on Blue Line corridors with ₹0 payment gateway fee.
How long does the metro take from Dakshineswar to Kavi Subhash (New Garia)?
The estimated train travel time is approximately 50 minutes across 25 station stops (approx 31.3 km), avoiding surface road congestion and traffic bottlenecks.
Do I need to change trains between Dakshineswar and Kavi Subhash (New Garia)?
No, this is a direct single-line route on the Blue Line. You do not need to change trains.
What are the first and last train timings from Dakshineswar?
On weekdays, the first train departs Dakshineswar around 06:50, and the last scheduled train departs at approximately 21:40. Sunday services follow adjusted weekend timetables.